OCHS Lift Station

OCHS Lift Station
Ontario , CA
Architect
Romtec Utilities
Project Size
12 Sq Feet

To compliment the new Ontario Christian High School Gym & Student Center CCI installed a new force main sewer lift station with specialized subterranean controls provided and installed by Romtec Utilities. Existing Utility Vaults and close proximity to existing Public Utilities added to the complexity and required precision to complete the installation of the 12 foot diameter 32 foot deep shoring sleeve. With a peak flow rate of 216 gpm the lift station will accommodate future OCHS expansion plans.